![](https://i69finishline.com/wp-content/uploads/2024/02/OnTrack_Header-1024x249.png)
![](https://i69finishline.com/wp-content/uploads/2024/02/Social_Headers_465-1-1024x61.png)
I-465 lane and ramp closures:
- Expect a double-lane restriction with 20-minute stops on westbound I-465 from I-65 to US 31/East Street on Monday, June 17, from 9 p.m. to 5 a.m. for paving upgrades and drainage work.
- Starting at 9 p.m. on Tuesday, June 18, through 8 a.m. on Saturday, June 22, westbound I-465 from I-65 to US 31/East Street will be reduced to two lanes for paving upgrades.
- Starting at 9 p.m. on Friday, June 21, through 5 a.m. on Monday, June 24, expect a double right-lane closure on westbound I-465 between I-65 and Kentucky Avenue/SR 67, and a full closure of Bluff Road under I-465 from Thompson Road to Hanna Avenue for overhead bridge demolition. There will be a detour in place during the Bluff Road closure that follows Thompson Road and Hanna Avenue to Meridian Street.
![](https://i69finishline.com/wp-content/uploads/2024/06/Bluff-Road-Closure-and-Detour_Summer-2024-1024x791.jpg)
- The southbound US 31/East Street ramp to I-465 westbound will remain closed into summer.
- Harding Street under I-465 will be reduced to one through lane and one left-turn lane for the remainder of 2024.